11:04, 06 September 2022

OMK Installs High Temperature UTS Testing Machine at Belgorod Plant

Russian pipe maker United Metallurgical Company OMK, a Metal-Expo regular exhibitor, OMK’s Energomash has installed new equipment for tensile testing of metal at elevated temperatures of up to 900 degree Celsius at the central factory laboratory of the Belenergomash in Belgorod region of Russia. Such tests are necessary for product quality control and research in the development of technologies. Investments amounted to more than 18.5 million rubles. The equipment with a capacity of 5 tonnes will complement the four existing similar testing machines that are already operating at the enterprise, and will increase the number of tests carried out. The machine is highly accurate and reproduces the results of tensile tests on a wide range of different materials.

Break tests at elevated temperatures are quite time consuming. They are often subjected to products for the nuclear industry, which is the traditional market of the OMK Belgorod plant. The installation of modern testing equipment will allow not only obtaining results that meet international quality standards, but will also significantly speed up the acceptance and shipment of products to customers.

New on the topic

A large-scale program of events has been prepared for the participants of the metal structures market

Exactly one week from now, the Steel Construction Forum SteelStructures 2025 will start, bringing together companies specializing in the production of steel structu...

27 May, 17:12

Lipetskprofil to showcase cutting-edge solutions at SteelStructures’2025 exhibition

Lipetskprofil, one of the leading Russian manufacturers of building steel structures, will take part in the international specialized exhibition SteelStructures’2025, which will be held fr...

23 May, 14:27

SZMK opened its own design office

SZMK can manufacture products according to ready-made designs. But there are all the necessary competencies to independently design any product from scratch or audit a third-party project to identify inaccuracies in it, assess the prospects for replacin...

19 May, 14:19

Reduced cost of steel refining with cored wire treatment

Improved stability and calcium recovery rate with reduced cost of secondary metallurgy in large-scale steelmaking: this was the challenge set by the technical specialists of NPP Technology during the development of the INST...

14 May, 16:52
Subscription to newsletter